|
Deliverables produced within the WISEBED project. Deliverable No | Deliverable name | pdf | | | WP1: Hardware | | D1.1, D2.1, and D3.1 | Design of the Hardware Infrastructure, Architecture of the Software Infrastructure, and Design of Library of Algorithms | 
| D1.2 | Initial Hardware Installation | 
| D1.3 | Final Hardware Installation |
| | D1.4 | WISEBED Distributed Laboratories | | | D1.5 | Hardware Capabilities, Maintenance and Future Dimensions | | | | WP2: Software | | D2.1 | see D1.1 | | D2.2 | Report on the Implementation of the Software Infrastructure
| 
| D2.3 | Report on the Integration of the Software Infrastructure
| 
| | D2.4 | The Developer’s Handbook for the Software Infrastructure | | | | WP3: Algorithms | | D3.1 | see D1.1
| | D3.2 | First Set of Algorithms Implementation
| 
| D3.3 | Second set of Algorithms Implementation and Library Integration
| 
| | D3.4 | Library of Algorithms for Wireless Sensor Networks | | | | WP4: Data | | D4.1 | First Set of Well-Designed Simulations, Experiments and Possible Benchmarks
| 
| D4.2 | Second Set of Real Test-Bed Experiments and Simulation Scenarios
|
| D4.3 | Compedium of Experimental Scenarios, Traces and Benchmarks
| | | | WP5: Dissemination and Joint Research Activities Login and Password are required to download the WP5 Deliverables. You can look them up in the internal section. | | | D5.1 | Links between research and experimentation
| 
| | D5.2 | First Report on Dissemination and Joint Research Activities
| 
| | | WP6: Management, Review and Self-Assessment Login and Password are required to download the WP6 Deliverables. You can look them up in the internal section. | | | D6.1 | Project Code Repository,Web Portal and Services | | | D6.2 | Intermediate Report on Management |  | | D6.3 | First Periodic Report
| |
|